Working with MW Golden Constructors, Hord Coplan Macht, and Colorado Pool Designs, our team fully renovated this full-depth pool and constructed a new zero-depth tot pool for the Vista Clubhouse Pool in Genesee. Our scope of work included the following: Plaster, shotcrete, mechanical work, underground piping, low voltage controls/wiring, pool deck, and coping.
Colorado Hardscapes installed almost 6,500 SF of broom finished concrete on the pool deck. Continuing, we formed and placed 233 LF of coping. For colors, we used Pebble on the pool deck and white color hardener for the coping. We plastered the pools using Cool Blue Diamond Brite. The tot pool also features three jelly bean rocks.
Since the completion of this project, our passion for the turn-key pool industry has only grown.





